Peacock Engineer Limited provided specialist engineering setting out services for the Clifton Network Rail replacement project, delivering continuous round-the-clock support throughout the works. Operating within strict rail possession timeframes, the company supplied accurate survey control, track alignment, and dimensional verification services to support the successful installation and replacement of critical rail infrastructure. Through precise setting out, close coordination with construction teams, and a strong focus on safety and quality, Peacock Engineer Limited ensured all works were completed efficiently and in accordance with Network Rail engineering standards.
M6 West Coast Bridge Replacement
£60m West Coast Mainline replacement, Clifton
Clifton, Penrith
Project Overview
Project Impact
The Clifton Network Rail replacement project delivered significant improvements to the reliability, safety, and long-term performance of the railway infrastructure within the area. Peacock Engineer Limited’s continuous engineering support played a key role in ensuring the works progressed efficiently during critical possession periods, helping contractors maintain programme deadlines while minimising disruption to rail operations.
Through accurate setting out and round-the-clock engineering assistance, the project achieved high levels of precision during installation, reducing the risk of delays, rework, and alignment issues. The successful coordination of engineering activities contributed to the safe and efficient replacement of rail infrastructure while maintaining compliance with Network Rail standards and tolerances.
The project further demonstrated Peacock Engineer Limited’s capability to operate within demanding live rail environments, providing dependable engineering solutions under strict time constraints and supporting the successful delivery of essential transport infrastructure improvements.